Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 11 results ...

Atkin, B L and Gill, E M (1986) CAD and Management of Construction Projects. Journal of Construction Engineering and Management, 112(04), 557–65.

Chang, L (1986) Inferential Statistics for Craftsman Questionnaire. Journal of Construction Engineering and Management, 112(04), 492–9.

Chang, L and Borcherding, J D (1986) Craftsman Questionnaire Sampling. Journal of Construction Engineering and Management, 112(04), 543–56.

  • Type: Journal Article
  • Keywords: Construction management; Productivity; Performance characteristics; Sampling; Delay time; Data collection;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1986)112:4(543)
  • Abstract:
    Craftsman Questionnaire Sampling (CQS) was recently developed for performance measurement and productivity improvement at construction sites. CQS uses a questionnaire to collect data. It has the virtues of the Craftsman Questionnaire Survey, which provides information regarding the sources of delays, the amount of rework performed, as well as creating a participating atmosphere on site. Meanwhile, CQS imitates the sampling procedure from the Work Sampling method by randomly selecting craftsmen in the field and asking them to determine the activities involved in the immediate past. This procedure empowers the CQS to apply the theory of binominal distribution to estimate ratio delays and to maintain the advantages of relative simplicity and statistical reliability as the Work Sampling method does. CQS was tested at a large nuclear power plant site. The results indicated the feasibility and efficiency of CQS in helping construction management identify delays that could provide a base for productivity improvement.

Chrzanowski, E N and Johnston, D W (1986) Application of Linear Scheduling. Journal of Construction Engineering and Management, 112(04), 476–91.

De La Garza, J M and Melin, J W (1986) Prepayment Ability to Offset Inflation. Journal of Construction Engineering and Management, 112(04), 514–29.

Hadipriono, F C, Lim, C and Wong, K (1986) Event Tree Analysis to Prevent Failures in Temporary Structures. Journal of Construction Engineering and Management, 112(04), 500–13.

Jaafari, A and Mateffy, V K (1986) Games People Play with Cost Control in Australia. Journal of Construction Engineering and Management, 112(04), 566–81.

Laufer, A and Ledbetter, W B (1986) Assessment of Safety Performance Measures at Construction Sites. Journal of Construction Engineering and Management, 112(04), 530–42.

O'Connor, J T, Larimore, M A and Tucker, R L (1986) Collecting Constructability Improvement Ideas. Journal of Construction Engineering and Management, 112(04), 463–75.

Ramaswamy, S D and Pertusier, E M (1986) Construction of Barrettes for High‐Rise Foundations. Journal of Construction Engineering and Management, 112(04), 455–62.

Tyvand, J and Blachly, A T (1986) Foamed Plastic Absorbs Staged Post‐Tensioning Deflections. Journal of Construction Engineering and Management, 112(04), 582–7.